Mon - Sat 8.00 - 20.00
Serving Doncaster Borough
A big challenge to have this job ready in the six weeks holidays. The roofs consisted of felt roofs, hot melt and old coatings. We had to strip many of the roofs and re cover them in Resitrix SKW. It was a logistical nightmare as access to the roofs was limited. There were roofs which were tougher then others and the weather was not great along with an exacting brief. We tried our hardest and had a great result.[/constructed_text_block][constructed_text_block]